SELF-GUIDED / SOUTH KOREA
Ocheon & Geumgang Bike Paths
About 2–6 riding days · Regular riders
251 kmQuick details
Ocheon Bike Path 105 + Geumgang Bike Path 146 = 251 km. Sum of the full individual paths; connections, transfers and retraced sections are additional. Includes the Daecheong Dam section, unlike an itinerary continuing only downstream from Hapgang Park.
Distance source ↗Along the way
Combine the Ocheon and Geumgang paths in one trip. The full Geumgang route includes Daecheong Dam; the order of stages and any retraced sections are reviewed in your itinerary.
Ocheon Bike Path + Geumgang Bike Path
Ask us to prepare a cycling passport, then collect stamps at the certification centres along your route. See the stamps & medals →
Planning this route
- Endpoints
- Haengchon Intersection → Hapgang Park / Daecheong Dam → Geumgang Estuary
- Main stops
- Goegang Bridge · Baengno Park · Musimcheon Bridge / Sejong Weir · Gongju Weir · Baekje Weir · Seongdang Port
- Climbs
- Review climbs and descents on the selected daily track; a river or coastal route is not necessarily flat. / Review climbs and descents on the selected daily track; a river or coastal route is not necessarily flat.
- Access and return
- Yeonpung bus stop for the start; Sejong bus terminal for return. Allow separate travel between the terminal and the route and confirm bicycle carriage. / Sintanjin Station is an access candidate; Gunsan Station or terminal for return. Transfers to the exact endpoints and bicycle carriage are checked separately.
- Stay areas to consider
- Goesan · Jeungpyeong · Sejong. Candidate areas only; rooms and bike storage unconfirmed. / Sejong · Gongju · Buyeo · Gunsan. Candidate areas only; rooms and bike storage unconfirmed.
- Connections
- 251 km adds both full paths. Continuing downstream from Hapgang alone misses the Daecheong Dam section. Decide the order and any transfer or retracing separately.
Map & elevation
Reference track by a Wikiloc contributor. Its start, finish and distance may differ from the programme shown above; we check the daily route when preparing your itinerary.
Daecheong Dam → Gunsan Terminal · 2026
Powered by Wikiloc · Open route ↗
What’s included
Included
Rental includes fitting, departure briefing, route guidance and local food tips.
Optional extras
- Accommodation
- Meals
- Start transfer / van (per group) — quote required
- Return train tickets (per rider) — quote required
- Bicycle recovery — quote required
- Guide (priced per group)
- Cycling passport
Not included
- Flights
- Activities outside your itinerary
- Alcohol unless separately agreed
English trip support: hours and response scope agreed before booking. Vehicle transport and repairs are separate.
Indicative budget, not a confirmed price. Final quote follows date, room occupancy and availability checks.
Before you go
How do I find my way?
Use NAVER Map bicycle directions with your agreed itinerary. Blue route lines and bicycle signs help on marked stretches. Check junctions, diversions and the turn to your stay; app directions may differ from the certification route.
Riding in Korea →Will the daily distance suit me?
We review your experience, climbs and preferred pace before agreeing the stages. The map is a reference track, not a checked day-by-day itinerary.
What happens after I enquire?
We review your route, stays, meals, transport and costs, then reply by email. Your enquiry does not reserve accommodation or take payment.
See an example trip notebook →
